With reference to the feedstock constraints for Compressed Biogas (CBG) plants under the revamped GOBARdhan scheme, consider the following pairs:
Feedstock : Defining Logistical Constraint
- Press mud : Must be sourced within a 25-km radius of the plant due to rapid moisture-driven decay
- Paddy straw : Must be collected within a 15-day window during the Kharif and Rabi harvesting periods
- Cattle dung : Yields a significantly higher percentage of gas than paddy straw or other agricultural residues